Small gas-powered site near Wabasca.
Electrical demand
20 MW
On-site natural gas
Capital cost
Not published
as announced
Operator
Armada Nowlit
Cryptocurrency mining
Last verified
September 22, 2026
Primary-source record
Armada Nowlit Wabasca Data Centre is in MD of Opportunity, in the Northeast Alberta of Alberta. Its status as of September 22, 2026 is proposed.
Armada Nowlit Wabasca Data Centre is planned at 20 MW of electrical demand. Running continuously, that is enough electricity for roughly 24,340 Alberta homes, or 0.2% of the province's all-time record peak demand of 12,384 MW.
Armada Nowlit. Power: on-site natural gas. On-site natural gas, under AUC review.