Small isolated gas-powered site in the Kakwa area.
Electrical demand
10 MW
On-site natural gas
Capital cost
Not published
as announced
Operator
Undisclosed
Cryptocurrency mining
Last verified
September 22, 2026
Primary-source record
Kakwa Data Processing Centre is in MD of Greenview, in the Northwest Alberta of Alberta. Its status as of September 22, 2026 is proposed.
Kakwa Data Processing Centre is planned at 10 MW of electrical demand. Running continuously, that is enough electricity for roughly 12,170 Alberta homes, or 0.1% of the province's all-time record peak demand of 12,384 MW.
Undisclosed. Power: on-site natural gas. AUC-approved 8.4 MW isolated gas plant.