
Culture Alberta · Edmonton · Aug 12
Edmonton Super Load: 96-Metre, 749-Tonne De-Ethanizer Runs Whitemud Counterflow Tonight, Full Route and Timing
A 749-tonne de-ethanizer leaves south Edmonton at 11 p.m. Wednesday and drives counterflow down Whitemud Drive, Highway 216 and Highway 14 at 30 km/h. It stages on Highway 21 at 5 a.m., sits out Thursday, then finishes the run to the Dow site near Fort Saskatchewan on Friday. Here's the route, the timing, and what counterflow means for you.
Read the article