Beacon campus on Calgary’s eastern edge.
Electrical demand
400 MW
Grid connection
Capital cost
Not published
as announced
Operator
Beacon AI Centers
AI / high-performance computing
Last verified
September 22, 2026
Primary-source record
Beacon Chestermere AI Hub is in Chestermere, in the Calgary region of Alberta. Its status as of September 22, 2026 is proposed.
Beacon Chestermere AI Hub is planned at 400 MW of electrical demand. Running continuously, that is enough electricity for roughly 486,800 Alberta homes, or 3.2% of the province's all-time record peak demand of 12,384 MW.
Beacon AI Centers. Power: grid connection. Grid supply with a transmission extension.