A 1.3 GW grid-connected proposal north of Calgary.
Electrical demand
1.3 GW
Grid connection
Capital cost
Not published
as announced
Operator
Undisclosed
Not disclosed
Last verified
September 22, 2026
Primary-source record
Wild Rose Power Hub Data Centre is in Rocky View County, in the Calgary region of Alberta. Its status as of September 22, 2026 is proposed.
Wild Rose Power Hub Data Centre is planned at 1.3 GW of electrical demand. Running continuously, that is enough electricity for roughly 1,582,100 Alberta homes, or 10.5% of the province's all-time record peak demand of 12,384 MW.
Undisclosed. Power: grid connection. AESO grid connection requested.