One of three large proposals clustered in Wheatland County east of Calgary.
Electrical demand
950 MW
Grid connection
Capital cost
Not published
as announced
Operator
Goldfinch
Not disclosed
Last verified
September 22, 2026
Primary-source record
Goldfinch Technology Park is in Wheatland County, in the Calgary region of Alberta. Its status as of September 22, 2026 is proposed.
Goldfinch Technology Park is planned at 950 MW of electrical demand. Running continuously, that is enough electricity for roughly 1,156,150 Alberta homes, or 7.7% of the province's all-time record peak demand of 12,384 MW.
Goldfinch. Power: grid connection. AESO grid connection requested (P3102).