A cluster of small sites that each stay under the regulator’s 10 MW line.
Electrical demand
99 MW
Ten 9.9 MW sites across four campuses
Capital cost
Not published
as announced
Operator
FingerMotion
AI / high-performance computing
Last verified
September 22, 2026
Primary-source record
FingerMotion Brooks Campus Zone is in County of Newell, in the Southern Alberta of Alberta. Its status as of September 22, 2026 is proposed.
FingerMotion Brooks Campus Zone is planned at 99 MW of electrical demand (Ten 9.9 MW sites across four campuses). Running continuously, that is enough electricity for roughly 120,483 Alberta homes, or 0.8% of the province's all-time record peak demand of 12,384 MW.
FingerMotion. Power: on-site natural gas. Behind-the-meter natural gas at each site, sized under the 10 MW AUC threshold.