What we know
- Power
- Grid connection. City of Lethbridge grid.
- Timeline
- Operating since 2011.
- In perspective
- Enough for ~3,043 homes · 0% of Alberta's record peak · 0× Calgary's average draw
Whipcord LDC01 — questions people ask
Where is Whipcord LDC01?+
Whipcord LDC01 is in Lethbridge, in the Southern Alberta of Alberta. Its status as of September 22, 2026 is operating.
How much power will Whipcord LDC01 use?+
Whipcord LDC01 is planned at 2.5 MW of electrical demand. Running continuously, that is enough electricity for roughly 3,043 Alberta homes, or 0% of the province's all-time record peak demand of 12,384 MW.
Who is building Whipcord LDC01 and how will it be powered?+
Whipcord. Power: grid connection. City of Lethbridge grid.