Long-running bitcoin site on the city’s own gas-fired power.
Electrical demand
67 MW
Grid connection
Capital cost
Not published
as announced
Operator
Hut 8
Cryptocurrency mining
Last verified
September 22, 2026
Reported, not yet filed
Hut 8 Medicine Hat is in Medicine Hat, in the Southern Alberta of Alberta. Its status as of September 22, 2026 is operating.
Hut 8 Medicine Hat is planned at 67 MW of electrical demand. Running continuously, that is enough electricity for roughly 81,539 Alberta homes, or 0.5% of the province's all-time record peak demand of 12,384 MW.
Hut 8. Power: grid connection. City of Medicine Hat municipal utility.