A 1.2 GW grid request near Brooks.
Electrical demand
1.2 GW
Grid connection
Capital cost
Not published
as announced
Operator
Undisclosed
Not disclosed
Last verified
September 22, 2026
Primary-source record
Newell Data Centre (MPC Load) is in County of Newell, in the Southern Alberta of Alberta. Its status as of September 22, 2026 is proposed.
Newell Data Centre (MPC Load) is planned at 1.2 GW of electrical demand. Running continuously, that is enough electricity for roughly 1,460,400 Alberta homes, or 9.7% of the province's all-time record peak demand of 12,384 MW.
Undisclosed. Power: grid connection. AESO grid connection requested (P3109).